WE LIVE IN THE PRESENT,
WE THINK IN THE FUTURE
>
Trust in our professionalism, correctness and high quality!

AURUBIS BULGARIA


World leader in copper concentrates recycling and production of black and electrolytic copper.



MAIN PROJECTS
YEAR

Framework agreement for manufacture of electrical panels

2000 - 2009

Construction of LV substations and modernization of old ones:
Transformer substation 29 in Acid Plant, Transformer substation 206/1 in Acid Plant, Transformer substation 206/1 in Smelter, Transformer substation 202/2 and 207/2 in Smelter. Design, reconstruction, supply of necessary equipment, manufacture of distribution panels, electric installation, commissioning and start-up. Backup power Control, monitoring the status of the circuit breakers, data and alarms archiving.

2001
2006

Equipment for crushing and screening of fluxing agents: Construction of: lighting, earthing and power installation, Profibus trace; installation of I&C equipment for level monitoring; commissioning of sensors and I&C equipment; software provision for SIMOCODE panels; SIEMENS Variable Frequency Drives - set-up; transmitters set-up.

2002

Smelting division – construction of slag shaking automated system: manufacturing of control panels; construction of power installation, installation for Profibus trace control; commissioning of the entire system, participation in the start-up.

2002

Power Logic Power Management System: Design of the system; supply of the equipment, construction of communication system, optic and Modbus traces; installation of the equipment; programming the operator stations Profibus trace, compilation of web pages; commissioning of the entire system, participation in the start-up.

2003

Installation of frequency regulators: Supply of the equipment; installation; Participation in the test team.

2004

Installation and participation in start-up of pump station in Smelter: Upgade of the old system; manufacturing of control panels for pumps and actuators; manufacturing of control panel with SIEMENS controller; construction of the new installation, Profibus trace; optical trace; commissioning and participation in start-up.

2002

Electric installation works for reconstruction of contactor KA-2:
Manufacturing of control panels, construction of electrical installation, participation in start-up and commissioning.

2005

Installation for dust separation by electrical filters with redler:
Manufacturing of control panels, construction of electrical installation, participation in start-up and commissioning.

2005

Manufacturing and upgrade of electrical panels in Second System of Acid Plant in Cumerio Med

2007

Overhaul, Part Electrical and I&C and Automation of electrical panels

2007

Overhaul, Part Electrical and I&C and Automation of racker

2007

Construction of electrical installation in New refinery

2009

New framework agreement for manufacturing electrical panels

2009 - 2013

Manufacture of 61 pcs. SIMOCODE panels

2013

Manufactureof VFD panels and rework of others

2013

Manufacturing of 18 pcs. repair panels

2013

New framework agreement for panels manufacturing

2013 - 2016

Manufacturing and supply of VFD panel with frequency regulator

2014

Manufacturing of panels for control and pneumatics

2014

Manufacturing and supply of repair panels, Smelting division and Convertor division

2015

Manufacturing MDB 100.PY.11 to 20 for substations in Smelting division and Convertor division

2015



Project Gallery
INNOVATIONS AND EMPHASIS

NEW DEVELOPMENTS AND NEW SERVICES

QUALITY WITHOUT COMPROMISE

OSKAR – El EOOD is rated among the 100 most dynamic companies in Bulgaria according to “Capital 100”


SIEMENS Solution Partner
ENGINEERING PARTNERS
OFFICIAL DISTRIBUTOR OF

Telephones:
(+359) 2 962 46 93
(+359) 2 962 43 65

Fax:
(+359) 2 962 42 38