MAIN PROJECTS
Year

Replacement and upgrade of old electrical equipment with new one in Flotation Plant

2005

Replacement of the Synchronic Motor Mill control

2005

Engineering and construction of MCC for Underground Backfill line

2005

Supply and installation of panels type MCC and construction of electrical installation in Filter press

2007

Design and manufacturing of panels for Dundee Precious EAD

2007 - 2010

Manufacturing and supply of MCC 1101 – Switchgear for motor control.

2011

Installation of electrical equipment in Ore-dressing plant.

2011

Manufacturing of panels ventilation door.

2012

Design and construction of busbar system.

2012

Supply and installation of switchgear for control of el. motors and a Canalis busbar system, installation of power transformer 6/0.4 kV 1500 kVA.

2013

Replacement of power cables 6 kVof 4 pcs. transformers 6/0,4kV - 1000kvA in Substation № 2.

2014

Changing the control logic of of a diesel column – horizon 450.

2015

Manufacturing of electrical panel for pumps control 50Е50.

2015



Project Gallery
 
INNOVATIONS AND EMPHASIS

NEW DEVELOPMENTS AND NEW SERVICES

QUALITY WITHOUT COMPROMISE

OSKAR – El EOOD is rated among the 100 most dynamic companies in Bulgaria according to “Capital 100”


SIEMENS Solution Partner
ENGINEERING PARTNERS
OFFICIAL DISTRIBUTOR OF

Telephones:
(+359) 2 962 46 93
(+359) 2 962 43 65

Fax:
(+359) 2 962 42 38